Alblasserdam, 23 March, 2007 - After Idis Klusbedrijf and Bouwbedrijf Fortuyn started construction on the NAVRO club house Tuesday 22 March, they continued today. The first thing that was done early in the morning was to remove a small length of both beams with a welding torch, because they were a little bit too long. Subsequently the last six side panels were placed.

Before the roof beams could be attached, a rim was attached to the top of the inside of the side panels The roof beams were swiftly attached. Roof panels were placed on top of the roof beams. The contractors finished by making an opening in the roof for the storage cabinet.

Previous    NAVRO club house construction 5    Next