Alblasserdam, 26-31 March, 2007 - Monday 26 March the roof was laid and later that week Idis Klusbedrijf started with the floor.

Friday 30 March we brought a pair of heavy workbenches from storage. They have to be brought inside before the internal walls are placed, because after that they are too big to go inside. Because the floor isn't ready yet they are outside under a canvas for the time being. We also have brought floor panels to the club house.