Alblasserdam, 10 June, 2007 - Friday 8 June Harry Advokaat assisted by Arjen Plaizier started with the construction of the bar. They came as far as that the basic shape could already be distinguished. Last but not least, that day we were finally connected to the electricity grid.
Sunday 10 June Peter Leemker and Pleun Punt made much progress on the electrics in the workshop. Also some lights were connected, like the one above the front door.

Previous    NAVRO club house construction 17    Next
Go to top
JSN Boot template designed by JoomlaShine.com