Alblasserdam, 22 September, 2007 - Because of the NLD26 launch on 7 September we took two weekends rest, but after the launch, for which we already had to rent a van, we moved some more stuff from the Mijlpaal. All launch equipment went into the garden shed where we earlier had stored the cabinets and also some other large stuff was moved to the new club house. Nonetheless on the Wednesdays some small jobs were done, like insulating the kitchen ventilation and moving more boxes and the rack we used in the Mijlpaal for storing metal. The rack was also shortened. A shelf was made by Peter Leemker to fit above the lathe, which he finished painting Wednesday evening 19 September. That evening Fred van Arkel attached acrylic glass sheets behind the lathe to protect the wall.

Saturday 22 September Harry Advokaat finished the bar's foot support. It is covered in the same tiles as the floor and finished with an aluminum trim.

Previous    NAVRO club house construction 29    Next