Alblasserdam, 10-14 April, 2007 - Dies van Iwaarden of Idis Klusbedrijf, our contractor, did much work this week. Externally the hatch on the roof was made and the rain-pipes were fixed to the wall. However most work was done internally. After making the drainage and water supply the last part of the floor was laid. That part of the floor was also where the internal walls had to come. At the end of the week most of these walls were erected and the drainage and water supply were in place. Next week the insulation and panelling on the other side the walls will be finished.

Previous    NAVRO club house construction 8    Next