Alblasserdam, 17 June, 2007 - Sunday 17 June Pleun Punt and Fred van Arkel painted the skirting boards in the workshop and hallway. Meanwhile Peter Leemker continued with the electrics, later assisted by the other two. Fred van Arkel also stripped down the smaller workbench, as it will be shortened 1 metre in length. We also collected ten bar stools.

Previous    NAVRO club house construction 18    Next
Go to top
JSN Boot template designed by JoomlaShine.com